YUEMEI Polycarbonate sheet installation announcements

1)  Select the thickness of sheet exactly and consider the radius of curvature, flat type construction should be inclined of 11%. So as to dry the water.
(2)  In order to prevent internal stress, a certain expansion gap should be reserved to the sheet, like gap 3MM per meter.
(3)  The edge of the sheet should be minimum 25mm stretched in to frame. Install it into the fixed area.

(4)  Immediately remove protective film after installation is completed, then recover the film on the sheet one more time, until the completion of the project and then peel it off.