1) Select
the thickness of sheet exactly and consider the radius of curvature,
flat type construction should be inclined of 11%. So as to dry the
water.
(2) In order to prevent internal stress, a certain expansion gap should be reserved to the sheet, like gap 3MM per meter.
(3) The edge of the sheet should be minimum 25mm stretched in to frame. Install it into the fixed area.
(4) Immediately
remove protective film after installation is completed, then recover
the film on the sheet one more time, until the completion of the project
and then peel it off.
没有评论:
发表评论